Factory Wholesale Plastic LED Fiber Optic KTV Corridor Bedroom Living Room Ceiling IP67 Water-Resistant DMX512 Control Dimmable

Product Description

Fiber Optic Display
Fiber Optic Ceiling
Fiber Optic Ceiling Details
LED Lighting Effect
Indoor Installation
Ceiling Decor
DMX Control Lighting
Product Description
Panel Size 60x60cm
Products Application Room ceiling, KTV, Corridor, Bedroom, Living Room
Features Plastic LED Fiber Optic, IP67 Water-Resistant, DMX512 Control, Dimmable
i
Professional Manufacturing

Established in 2018, our facility focuses on the field of stage equipment. Specializing in stage lighting equipment, interactive game equipment, and LED dance floor R&D and manufacturing. Products include LED dance floors, activity game stage floors, stage lighting, and other entertainment integrated LED solutions. Main markets span across Europe, the United States, Asia, and Africa.

We hold relevant patents and CE/RoHS certifications. With a strong team constantly exploring and breaking through, we are committed to research and development of popular high-quality products. We support product customization, OEM, and ODM services to meet diverse customer needs.

?
Frequently Asked Questions
Can you provide OEM or ODM services?
Yes, we have an advanced R&D team. Products can be manufactured according to specific client requests and customizations.
Is it possible to print our logo on the LED lights?
Yes, we can print your custom logo on the pixel LED lights to match your brand identity.
Are samples available for testing?
Yes, we are pleased to provide samples for quality testing and verification before bulk orders.
What is the expected service life and warranty?
We offer a 24-month warranty along with life-time after-sales technical support for all our lighting products.
What certifications do your products hold?
Our LED lights are produced to high quality standards and are fully approved by CE and RoHS certifications.
What are the typical production lead times?
For samples, the lead time is about 3-5 days. For mass production, the lead time is typically 10-20 days after receiving payment.

Related Products